ARCHITECTURAL RISK MANAGEMENT

 

4.3 Project Management Implementation Strategy
Sustain-Tech Pty risk management plan will be strategically utilised through communicating all policies to employees, consultants and other related stake holders to ensure project risk aversion and success.
Communications Needs Analysis


Project Objective

Statement of Project Objectives

Internal Stakeholders

External Stakeholders

Project Impact

Issues to Consider Communicating
with Stakeholder

Stakeholder

Stakeholder

Stakeholder

Stakeholder

Stakeholder

Impact on project
objectives

Design Restrictions as per governing authority regulations

Designer

Director

Client

 

 

Project design brief may need to be adjusted to meet governing authority requirements.

Insufficient staff required for project documentation

Director

Project Leader

 

 

 

Project documentation delays pushing back project deadlines.

Specification materials not available

Project Leader

 

Client

 

 

Design may need to be altered due to lack of specified materials

Supply shortage of specified products

Project Leader

 

Client

Supplier

 

Design may need to be altered on selection of alternative product or project timeframe will be extended

Incorrect Site Survey Levels

Project Leader

Designer

Client

Land Surveyor

 

Delays to project to resolve discrepancy of levels in relation to building design

Hardware Failure / Data Loss

Director

Project Leader

 

 

 

Delays in project documentation

4.4 Profession Standards Scheme
As an integral part of all projects, each project must be assessed for compliance to all relevant regulations, codes and legislation such as the Professional Standards Scheme, OH & S Act and the National Construction Code.  
4.5 Management & Operational Focus,
Sustain-Tech Pty Ltd will implement in each and every project this risk management plan to ensure all risks are evaluated, considered and actioned throughout the life of the project – from feasibility stage to the tendering stage.
4.6 Engagement of Practical Methods
Sustain-Tech Pty Ltd will utilise all risk management techniques in preparing a detailed assessment of risk for every project. As a part of the risk management, the project will be assessed using risk management methods such as identifying the risk, prioritising, treating, dealing with, controlling and monitoring the risk. Each category will assess the exposure of the risk, the likelihood of the risk and the potential damage from the risk.


Rating

Severe

Major

Moderate

Minor

Negligible

Almost Certain

25

20

15

10

5

Likely

20

16

12

8

4

Possible

15

12

9

6

3

Unlikely

10

8

6

4

2

Rare

5

4

3

2

1

 

4.7 High Level of Compliance
Sustain-Tech Pty Ltd strives to provide the highest level of risk management compliance throughout every project. This will be achieved by adopting and actioning the strategic risk management plan policies and objectives integrated into the project management structure.

Risk Criteria

Used In

Consequence Levels:
The scale used to assess consequence levels

Risk Analysis

 

Consequence Table:
Matrix where consequence levels are described for different types of consequences

Risk Analysis

 

Likelihood table:
Scale used to assess the likelihood of risk

Risk Analysis

 

Control of effectiveness:
Scale used to assess risk controls

Risk Analysis

 

Risk Matrix:
Technique used to combine consequence and likelihood to determine the level of risk

Risk Analysis

 

Risk actions & escalation points:
Describes the escalation actions required for each risk level

Risk Analysis

 

Risk tolerance table:
Defines the response to the risk depending on whether or not to accept or tolerate risk

Risk Analysis

 

 

The following project risk management strategies will be utilised and implemented into each project risk management plan:
4.8 Company Structure

4.8.1 Company Acceptance of project Risk Management
Sustain-Tech Pty Ltd accepts the responsibility of implementing a risk management plan for each project to ensure strategic risk assessment and management are incorporated into all stages of the project.
4.8.2 Common Understanding
Sustain-Tech Pty Ltd will ensure all stakeholders within the scope of the project will understand the risks involved within the project, each stakeholder’s responsibilities to the risk throughout the project, and assist in identifying the risk for each stakeholder as a part of the risk management plan.
4.8.3 Control & Monitoring
Sustain-Tech Pty Ltd will ensure the identification of risk throughout the project will be managed to reduce, eliminate or action the risk appropriately.

4.8.4 Continual Improvement
As a major part of the risk management plan, Sustain-Tech Pty Ltd will endeavour to improve risk analysis of projects to ensure best risk management techniques are utilised in identifying and managing risk.                               

 